600 Main Street, Bridgeport, CT
Webster Bank Arena 207,000 Square Foot 10,000 seat Building
SCOPE OF WORK
Performed an ASHRAE Level II audit to determine optimal energy conservation measures. Delivered an energy conservation plan:
- Phase I; implemented energy data tracking monitors throughout building allowing for the proper identification of the top energy consumers;
- Phase II; analyzed energy data and developed recommendations for appropriate energy conservation measures;
- Phase III; prepared and applied for incentive dollars on behalf of the client.
PROJECT OUTCOME
- Client installed two 4000 MBH building heat condensing boilers at 96% efficiency, removing and replacing the two original units
- Performed LED lighting change out
- Installed energy management technology
ENERGY SAVINGS |
GROSS COST OF PROJECT |
19,139 CCF Annual Savings 417,000 kWh Annual Savings |
$649,244 |
INCENTIVES RECEIVED |
ROI |
|
5 years |
ENERGY EFFICIENCY PROJECT